{"id":6984,"date":"2019-08-18T09:55:00","date_gmt":"2019-08-18T07:55:00","guid":{"rendered":"https:\/\/www.gsegroup.ro\/?post_type=realisation&#038;p=6984"},"modified":"2026-08-18T09:59:17","modified_gmt":"2026-08-18T07:59:17","slug":"xenocs","status":"publish","type":"realisation","link":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/","title":{"rendered":"xenocs"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">5,500 m\u00b2 four-story building with underground parking, ground-floor laboratories, and offices on the upper floors in Grenoble: designed and built by GSE<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">A building designed to combine functionality and modernity<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies. The laboratories on the ground floor integrate seamlessly with the offices on the upper floors, offering a fluid and optimal layout. The contemporary architecture highlights carefully selected materials, bright spaces, and four accessible terraces. Designed to be flexible, this multi-tenant building easily adapts to the requirements of its various occupants, while offering comfortable and pleasant workspaces.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">A Response to the Environmental and Urban Challenges of the Presqu\u2019\u00eele<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project\u2019s location on the Presqu\u2019\u00eele de Grenoble presents several environmental and urban challenges. Situated on a constrained and narrow site, the building strictly complies with regulations related to technological and natural risks (PPRT and PPRI). At the same time, addressing the site\u2019s environmental constraints has led to cutting-edge technical solutions. The installation of a water-to-air heat pump that draws on the groundwater table exemplifies this commitment to ecological innovation, enabling a significant reduction in the carbon footprint while ensuring high energy efficiency. This project is therefore fully aligned with an exemplary approach to sustainable development.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">A Response to the Environmental and Urban Challenges of the Presqu\u2019\u00eele<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project\u2019s location on the Presqu\u2019\u00eele de Grenoble presents several environmental and urban challenges. Situated on a constrained and narrow site, the building strictly complies with regulations related to technological and natural risks (PPRT and PPRI). At the same time, addressing the site\u2019s environmental constraints has led to cutting-edge technical solutions. The installation of a water-to-air heat pump that draws on the groundwater table exemplifies this commitment to ecological innovation, enabling a significant reduction in the carbon footprint while ensuring high energy efficiency. This project is therefore fully aligned with an exemplary approach to sustainable development.<\/p>\n","protected":false},"featured_media":6761,"menu_order":0,"template":"","categories-pays":[],"categorie-realisation":[32],"type-batiment":[],"class_list":["post-6984","realisation","type-realisation","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania<\/title>\n<meta name=\"description\" content=\"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania\" \/>\n<meta property=\"og:description\" content=\"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/\" \/>\n<meta property=\"og:site_name\" content=\"GSE Romania\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-18T07:59:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/XENOCS-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/\",\"name\":\"XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/XENOCS-1.jpg\",\"datePublished\":\"2019-08-18T07:55:00+00:00\",\"dateModified\":\"2026-08-18T07:59:17+00:00\",\"description\":\"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/XENOCS-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/XENOCS-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/xenocs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"xenocs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\",\"name\":\"GSE Romania\",\"description\":\"Gse Romania\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania","description":"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/","og_locale":"en_US","og_type":"article","og_title":"XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania","og_description":"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.","og_url":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/","og_site_name":"GSE Romania","article_modified_time":"2026-08-18T07:59:17+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/XENOCS-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/","url":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/","name":"XENOCS: Design and Construction of a 5,500 m\u00b2 four-story building with underground parking, laboratories on the ground floor, and offices on the upper floors in Grenoble - GSE Romania","isPartOf":{"@id":"https:\/\/www.gsegroup.ro\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/#primaryimage"},"image":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/XENOCS-1.jpg","datePublished":"2019-08-18T07:55:00+00:00","dateModified":"2026-08-18T07:59:17+00:00","description":"The building, designed by SCI Grenoble Innovation for Xenocs, stands out for its functionality and modern design. With a total floor area of 5,500 m\u00b2 spread over four levels (ground floor plus three stories), it combines diverse spaces to meet the needs of tenant companies.","breadcrumb":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/#primaryimage","url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/XENOCS-1.jpg","contentUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/XENOCS-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/xenocs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.gsegroup.ro\/en\/"},{"@type":"ListItem","position":2,"name":"xenocs"}]},{"@type":"WebSite","@id":"https:\/\/www.gsegroup.ro\/en\/#website","url":"https:\/\/www.gsegroup.ro\/en\/","name":"GSE Romania","description":"Gse Romania","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gsegroup.ro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation"}],"about":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/types\/realisation"}],"version-history":[{"count":0,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6984\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media\/6761"}],"wp:attachment":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media?parent=6984"}],"wp:term":[{"taxonomy":"categories-pays","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categories-pays?post=6984"},{"taxonomy":"categorie-realisation","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categorie-realisation?post=6984"},{"taxonomy":"type-batiment","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/type-batiment?post=6984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}