{"id":6977,"date":"2023-08-18T08:51:00","date_gmt":"2023-08-18T06:51:00","guid":{"rendered":"https:\/\/www.gsegroup.ro\/?post_type=realisation&#038;p=6977"},"modified":"2026-08-18T09:45:34","modified_gmt":"2026-08-18T07:45:34","slug":"vetropack","status":"publish","type":"realisation","link":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/","title":{"rendered":"vetropack"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\">A glassworks and a two-story warehouse in Boffalora Sopra Ticino: design and construction by GSE<\/h1>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">An industrial glassworks designed to combine performance and sustainability<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process. SuDS-type intermediate stormwater management systems ensure the site\u2019s hydraulic stability, while natural ventilation studies, conducted using computational fluid dynamics (CFD) simulations, help cool the production buildings. These measures are part of a comprehensive approach aimed at improving energy efficiency, reducing greenhouse gas emissions, and preserving air quality.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">Mastering Technical and Regulatory Constraints on a Brownfield Project<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The execution of this brownfield project required rigorous management of technical and administrative constraints. The teams oversaw complex permitting procedures, including AIA, VIA, PdC, and VVF applications, as well as obtaining a specific permit for the installation of a 60-meter-tall stack due to the project\u2019s proximity to an airport. The project also involved managing sensitive facilities, such as a 16-MW high-voltage electrical substation and a high-pressure gas reduction station (REMI cabin). The characteristics of the terrain necessitated in-depth geotechnical studies and the consolidation of the area designated for the warehouse through the installation of 2,800 rigid piles, totaling nearly 30,000 linear meters.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">A comprehensive design integrating production, logistics, and user comfort<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project comprises 11 buildings organized to optimize production and logistics operations. The plant includes two glass furnaces, a building dedicated to quality control, an office building housing plant management and the employee cafeteria, as well as a two-story logistics warehouse. Special attention was paid to coordinating the various technical systems to avoid conflicts with existing infrastructure and ensure the smooth operation of the facilities. The design also incorporates solutions aimed at improving operating conditions and user comfort, such as a two-level natural ventilation system in the warehouse, a specific acoustic study to reduce noise pollution from the furnace buildings, and careful consideration of the color schemes in workspaces to create a more pleasant environment for employees.<\/p>\n","protected":false},"featured_media":6779,"menu_order":0,"template":"","categories-pays":[],"categorie-realisation":[32],"type-batiment":[],"class_list":["post-6977","realisation","type-realisation","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania<\/title>\n<meta name=\"description\" content=\"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania\" \/>\n<meta property=\"og:description\" content=\"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/\" \/>\n<meta property=\"og:site_name\" content=\"GSE Romania\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-18T07:45:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2023\/08\/Vetropack-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/\",\"name\":\"VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2023\\\/08\\\/Vetropack-1.jpg\",\"datePublished\":\"2023-08-18T06:51:00+00:00\",\"dateModified\":\"2026-08-18T07:45:34+00:00\",\"description\":\"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2023\\\/08\\\/Vetropack-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2023\\\/08\\\/Vetropack-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/vetropack\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"vetropack\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\",\"name\":\"GSE Romania\",\"description\":\"Gse Romania\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania","description":"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/","og_locale":"en_US","og_type":"article","og_title":"VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania","og_description":"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.","og_url":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/","og_site_name":"GSE Romania","article_modified_time":"2026-08-18T07:45:34+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2023\/08\/Vetropack-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/","url":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/","name":"VETROPACK: Design and Construction of a Glassworks and a Two-Story Warehouse in Boffalora Sopra Ticino - GSE Romania","isPartOf":{"@id":"https:\/\/www.gsegroup.ro\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/#primaryimage"},"image":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2023\/08\/Vetropack-1.jpg","datePublished":"2023-08-18T06:51:00+00:00","dateModified":"2026-08-18T07:45:34+00:00","description":"This glassworks was designed to meet the production requirements of the glass industry while minimizing its environmental impact. The project incorporates several sustainability-focused solutions, including a system that recovers heat from furnace exhaust gases to produce the hot and cold fluids needed for the industrial process.","breadcrumb":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/#primaryimage","url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2023\/08\/Vetropack-1.jpg","contentUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2023\/08\/Vetropack-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/vetropack\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.gsegroup.ro\/en\/"},{"@type":"ListItem","position":2,"name":"vetropack"}]},{"@type":"WebSite","@id":"https:\/\/www.gsegroup.ro\/en\/#website","url":"https:\/\/www.gsegroup.ro\/en\/","name":"GSE Romania","description":"Gse Romania","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gsegroup.ro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation"}],"about":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/types\/realisation"}],"version-history":[{"count":0,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6977\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media\/6779"}],"wp:attachment":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media?parent=6977"}],"wp:term":[{"taxonomy":"categories-pays","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categories-pays?post=6977"},{"taxonomy":"categorie-realisation","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categorie-realisation?post=6977"},{"taxonomy":"type-batiment","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/type-batiment?post=6977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}