{"id":6933,"date":"2018-01-12T15:31:00","date_gmt":"2018-01-12T14:31:00","guid":{"rendered":"https:\/\/www.gsegroup.ro\/?post_type=realisation&#038;p=6933"},"modified":"2026-08-17T15:38:12","modified_gmt":"2026-08-17T13:38:12","slug":"becton-dickinson","status":"publish","type":"realisation","link":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/","title":{"rendered":"BECTON DICKINSON"},"content":{"rendered":"\n<h1 class=\"wp-block-heading has-text-align-left\">High-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium: Constructed by GSE<\/h1>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">An international pharmaceutical logistics hub serving European distribution<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market. This position makes it a strategic link in the supply chain for the hospital and pharmaceutical sectors, where reliability and continuity of service are essential.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">A complex industrial design project on an occupied site undergoing transformation<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project involves a major renovation of the existing site, including the demolition of a 5,000 m\u00b2 building followed by the construction of a new 8,000 m\u00b2 complex. This work was carried out adjacent to an existing site across the street that remained operational throughout, imposing significant constraints on business continuity.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The complexity of the project also lies in the integration of technical connections with the existing building, particularly the IT systems, the sprinkler system, the emergency generator, and the centralized technical management system (CTMS). This interface between the old and new sites required precise coordination to ensure the continuity of essential workflows and systems throughout the construction period.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\">Technical Excellence Supporting Automated Logistics and Climate Control<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The building is designed as a fully automated, high-bay logistics facility. It features 5,500 m\u00b2 of high-bay storage space, reaching a height of 38.5 m, with self-supporting racks and a capacity of 40,000 pallet spaces, complemented by 300 m\u00b2 of office space. The equipment includes two conveyor lines, five stacker cranes, a sorting machine, and an automatic packaging system, enabling a high level of logistics performance.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Storage conditions are strictly controlled, with the temperature maintained between 15 and 25 \u00b0C, notably through free cooling and a temperature mapping system that ensures thermal stability. The facility is complemented by photovoltaic panels that contribute to the site\u2019s energy self-consumption. Special attention was also paid to the design of the facades, enhancing the building\u2019s architectural quality in addition to its technical performance.<\/p>\n","protected":false},"featured_media":6627,"menu_order":0,"template":"","categories-pays":[],"categorie-realisation":[32],"type-batiment":[],"class_list":["post-6933","realisation","type-realisation","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania<\/title>\n<meta name=\"description\" content=\"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania\" \/>\n<meta property=\"og:description\" content=\"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/\" \/>\n<meta property=\"og:site_name\" content=\"GSE Romania\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-17T13:38:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/BECTON-DICKINSON-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/\",\"name\":\"Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/BECTON-DICKINSON-1.jpg\",\"datePublished\":\"2018-01-12T14:31:00+00:00\",\"dateModified\":\"2026-08-17T13:38:12+00:00\",\"description\":\"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/BECTON-DICKINSON-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gsegroup.ro\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/08\\\/BECTON-DICKINSON-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/realisation\\\/becton-dickinson\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BECTON DICKINSON\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/\",\"name\":\"GSE Romania\",\"description\":\"Gse Romania\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.gsegroup.ro\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania","description":"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/","og_locale":"en_US","og_type":"article","og_title":"Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania","og_description":"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.","og_url":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/","og_site_name":"GSE Romania","article_modified_time":"2026-08-17T13:38:12+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/BECTON-DICKINSON-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/","url":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/","name":"Becton Dickinson: Construction of a high-rise automated building dedicated to the storage of products for the pharmaceutical and hospital industries in Belgium - GSE Romania","isPartOf":{"@id":"https:\/\/www.gsegroup.ro\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/#primaryimage"},"image":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/BECTON-DICKINSON-1.jpg","datePublished":"2018-01-12T14:31:00+00:00","dateModified":"2026-08-17T13:38:12+00:00","description":"The BECTON DICKINSON DISTRIBUTION CENTER N.V. project is part of a globalized logistics network. The site stores pharmaceutical products sourced from the United States, South America, and Asia, with the aim of redistributing them to the European market.","breadcrumb":{"@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/#primaryimage","url":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/BECTON-DICKINSON-1.jpg","contentUrl":"https:\/\/www.gsegroup.ro\/wp-content\/uploads\/sites\/7\/2026\/08\/BECTON-DICKINSON-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.gsegroup.ro\/en\/realisation\/becton-dickinson\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.gsegroup.ro\/en\/"},{"@type":"ListItem","position":2,"name":"BECTON DICKINSON"}]},{"@type":"WebSite","@id":"https:\/\/www.gsegroup.ro\/en\/#website","url":"https:\/\/www.gsegroup.ro\/en\/","name":"GSE Romania","description":"Gse Romania","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gsegroup.ro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation"}],"about":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/types\/realisation"}],"version-history":[{"count":0,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/realisation\/6933\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media\/6627"}],"wp:attachment":[{"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/media?parent=6933"}],"wp:term":[{"taxonomy":"categories-pays","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categories-pays?post=6933"},{"taxonomy":"categorie-realisation","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/categorie-realisation?post=6933"},{"taxonomy":"type-batiment","embeddable":true,"href":"https:\/\/www.gsegroup.ro\/en\/wp-json\/wp\/v2\/type-batiment?post=6933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}